By KRobinson on Monday, 16 September 2024
Category: Current Projects

Mid-South Control Line

Mid-South Control Line | 7,150 SF Warehouse | Houston, TX

This project includes a 7,150 SF single slope warehouse, with three overhead bay doors, liner panel, a fully insulated roof and fully insulated walls.

9.16.24 - The foundation was poured this morning and is curing,

9.13.24 -  Crews are forming the pad for the foundation pour,

9.10.24 - Crewmen are pouring piers,

8.26.24 - Crewmen are pouring the truck well walls,

8.14.24 - Crewmen are pouring the loading dock,

Related Posts